Bathroom Remodeling · Maynard, MA

Bathroom remodeling in Maynard,from the shop down the road.

Maynard is home. Our shop is here, which means when your job is on the calendar it is not competing with a two-hour commute — the crew is on your street early and the truck comes back if something is missing.

(508) 734-4894
Estimate
Free on-site estimate
Written price
Written price in 48 hours
Track record
Middlesex County
Based in
Maynard, MA · Greater Boston

Maynard, Massachusetts

What a Maynard bathroom throws at a crew.

The town grew up around the Assabet River and the mill, and the housing followed: late-1800s and early-1900s two-families and workers' cottages on the side streets off Main and Nason, gambrels and capes further out, and a steady run of post-war ranches. The bathrooms in those houses tend to be small, second-floor and original — a 5×7 with a cast-iron tub, a mud-set floor and a fan that vents into the attic instead of outside.

That is exactly the job we do best: strip it to the studs, fix what forty years of small leaks did to the subfloor, get the venting right, and put back a room that is worth the square footage it takes up.

Areas we workDowntown MaynardAssabet VillageGreat RoadGlenwood

What we run into here

Small second-floor baths
5×7 and 5×8 rooms where every inch of layout counts and a recessed niche is the difference between usable and cramped.
Mill-era framing
Old joists and long-gone leaks. We open the floor, look, and tell you what we find before we build over it.
Fans vented to nowhere
A surprising number of older Maynard baths exhaust into the attic. New fan, ducted outside, every time.

What it costs you in days

Seven working days in Maynard.

The sequence doesn't change from town to town — only what we find behind the plaster does.

  1. 01Day 1

    Protection and demo

    Dust wall up, room stripped to the studs, debris out the same day. This is also when surprises surface, and when we tell you about them.

  2. 02Day 2

    Rough plumbing and electrical

    New drain and supply, valve set, GFCI and lighting, fan ducted outside. Permits pulled with your town and inspections scheduled by us.

  3. 03Day 3

    Waterproofing

    Mortar bed, membrane, banded corners, flood test. This is the day that decides whether the ceiling below stays dry for twenty years.

  4. 04Day 4

    Tile and grout

    Dry layout first so the cuts are deliberate. Then wall, floor, niche, grout, and silicone at every corner and change of plane.

  5. 05Day 5

    Vanity, fixtures and trim

    Everything you actually touch goes in: vanity, top, faucet, toilet, mirror, lighting, hardware, door and trim.

  6. 06Day 6

    Walk-through and sign-off

    We walk the room with you, write the punch list, finish it, and clean the space before we invoice.

The work

Bathrooms we build.

Marble walk-in shower next to a freestanding tub with a walnut vanityFig. 01
Tiled shower with a rain head and a herringbone marble wallFig. 02
Marble bathroom with a double vanity, brass faucets and oval mirrorsFig. 03
Curbless walk-in shower in large-format grey tile with black fixturesFig. 04
White bathroom with a glass shower enclosure and a wood-floor vanity wallFig. 05
Grey tiled bathroom with a soaking tub, wood vanity and towel warmerFig. 06

Reference builds in the configurations and materials we work in. Photography of 7 Days projects is added here as jobs are completed and released by the homeowner.

What clients say

Verified reviews,on Angi.

Verified reviews from the 7 Days profile on Angi.

4.8

4 reviews

on Angi

I hired 7 Days Remodel & Contracting to replace my deck and repair the front porch. I also needed new kitchen and bathroom flooring and tile on the kitchen counter and upstairs bathroom. Al and his team were extremely professional and multitasked to complete interior and exterior while I was away on military orders. Pleasantly surprised and extremely satisfied with the outcome and highly recommend them — Al communicated consistently throughout the process and completed the work as discussed prior to my return and on budget.
Jake D.Build or Replace a Deck or Non-Masonry PorchAngi · Sep 22, 2025
Al did a great job on our renovation of our three-unit apartment building. He showed up, his team showed up, and everyone was skilled, delivering a great result.

R.S.S.

Angi · Oct 7, 2025

They start and finish the work and I'm happy.

Jim B.

Angi · Sep 12, 2025

The job was done in a timeframe that was shorter than projected. Their team was very professional and did a great job cleaning up behind themselves.

Gregory H.

Angi · Aug 16, 2025

Genuine, verified customer reviews from the 7 Days profile on Angi. Names are shown exactly as Angi publishes them.

Straight answers

Bathroom questions we get in Maynard.

How long does a bathroom remodel take?

A standard full bath runs about seven working days on site, plus the shower glass, which is templated after the tile is grouted and installed when the fabricator delivers. Layout changes, custom tile patterns and long-lead vanities push that out — and we put the real number in your written proposal instead of the optimistic one.

Can we still use the bathroom while you work?

Not the one we're building. If it's your only full bath, tell us at the estimate — we sequence the toilet back in as early as the work allows and we'll tell you honestly which nights you'll want a plan B.

Do you pull the permits?

Yes. Plumbing and electrical permits are pulled with your town's building department and we schedule the inspections. You don't chase paperwork.

What does a bathroom remodel cost?

It depends on the size of the room, whether the layout moves, and what you pick for tile, vanity, fixtures and glass. We don't quote bathrooms over the phone. The on-site estimate is free, takes about thirty minutes, and produces a written itemized price within 48 hours.

Can you convert a tub into a walk-in shower?

Yes, and it's one of the most common jobs we do in older Greater Boston homes. It usually means a new pan and drain location, a proper sloped mortar bed and membrane, and a decision about whether to keep a curb or go curbless — which depends on your joists. We look at that at the estimate.

Do you do small bathrooms and powder rooms?

Yes. A 5×7 second-floor bath in a 1920s two-family is our bread and butter, and a powder room is a short job we're happy to schedule.

What about asbestos or lead paint?

We don't do asbestos abatement or de-leading — those need a licensed specialist and we'll refer you to one. If we find something behind the wall during demo, we stop, tell you, and don't disturb it.

Who is actually in my house?

Our own vetted, certified crew. Same faces from demo day to the final walk-through, and you have Alessandro's number the entire time.

Free on-site estimate

Book a free estimate in Maynard

Thirty minutes in your bathroom, Monday to Saturday between 3 and 5 PM. Written itemized proposal within 48 hours.

+1 (508) 734-4894
Estimate window
Mon–Sat · 3:00 PM – 5:00 PM
On site
About 30 minutes
Written price
Within 48 hours

Tell us about the room

Two fields are required. The rest just makes the estimate faster.

Or call or text +1 (508) 734-4894 — we answer.