Kitchen & Bathroom Remodeling · Maynard, MA
- Estimate on site00
- Selections and orders01
- Protection and demo02
- Rough plumbing and electrical03
- Waterproofing (bath) or cabinets (kitchen)04
- Tile or countertop05
- Fixtures, trim and walk-through06
Bathroom remodeling in Maynard,from the shop down the road.
Maynard is home. Our shop is here, which means when your job is on the calendar it is not competing with a two-hour commute — the crew is on your street early and the truck comes back if something is missing.
- Estimate
- Free on-site estimate
- Written price
- Written price in 48 hours
- Track record
- Middlesex County
- Based in
- Maynard, MA · Greater Boston
Maynard, Massachusetts
What a Maynard bathroom throws at a crew.
The town grew up around the Assabet River and the mill, and the housing followed: late-1800s and early-1900s two-families and workers' cottages on the side streets off Main and Nason, gambrels and capes further out, and a steady run of post-war ranches. The bathrooms in those houses tend to be small, second-floor and original — a 5×7 with a cast-iron tub, a mud-set floor and a fan that vents into the attic instead of outside.
That is exactly the job we do best: strip it to the studs, fix what forty years of small leaks did to the subfloor, get the venting right, and put back a room that is worth the square footage it takes up.
- Small second-floor baths
- 5×7 and 5×8 rooms where every inch of layout counts and a recessed niche is the difference between usable and cramped.
- Mill-era framing
- Old joists and long-gone leaks. We open the floor, look, and tell you what we find before we build over it.
- Fans vented to nowhere
- A surprising number of older Maynard baths exhaust into the attic. New fan, ducted outside, every time.
What we run into here
What it costs you in days
Seven working days in Maynard.
The sequence doesn't change from town to town — only what we find behind the plaster does.
- 01Day 1
Selections and orders
Cabinets, tops, tile, vanity, fixtures and appliances chosen and ordered first. For a kitchen, nothing gets demolished until the cabinet delivery date is real.
- 02Day 2
Protection and demo
Dust wall up, room stripped to the studs, debris out the same day. This is also when surprises surface, and when we tell you about them.
- 03Day 3
Rough plumbing and electrical
New drain and supply, valve or sink location set, GFCI and lighting, fan or hood ducted outside. Permits pulled with your town and inspections scheduled by us.
- 04Day 4
Waterproofing (bath) or cabinets (kitchen)
In a bathroom: mortar bed, membrane, banded corners, flood test — the day that decides whether the ceiling below stays dry for twenty years. In a kitchen: cabinets set and levelled to a laser line.
- 05Day 5
Tile or countertop
Bathroom walls, floor and niche tiled and grouted. Kitchen countertops templated on the installed cabinets, fabricated and seamed in.
- 06Day 6
Fixtures, trim and walk-through
Vanity or backsplash finish, faucets, toilet, appliances, hardware, lighting. We walk the room with you, write the punch list, finish it, and clean the space before we invoice.
The work
Bathrooms we build.
Reference builds in the configurations and materials we work in. Photography of 7 Days projects is added here as jobs are completed and released by the homeowner.
What clients say
Verified reviews,on Angi.
Verified reviews from the 7 Days profile on Angi.
4.8
4 reviews
on Angi
“I hired 7 Days Remodel & Contracting to replace my deck and repair the front porch. I also needed new kitchen and bathroom flooring and tile on the kitchen counter and upstairs bathroom. Al and his team were extremely professional and multitasked to complete interior and exterior while I was away on military orders. Pleasantly surprised and extremely satisfied with the outcome and highly recommend them — Al communicated consistently throughout the process and completed the work as discussed prior to my return and on budget.”
“Al did a great job on our renovation of our three-unit apartment building. He showed up, his team showed up, and everyone was skilled, delivering a great result.”
R.S.S.
Angi · Oct 7, 2025
“They start and finish the work and I'm happy.”
Jim B.
Angi · Sep 12, 2025
“The job was done in a timeframe that was shorter than projected. Their team was very professional and did a great job cleaning up behind themselves.”
Gregory H.
Angi · Aug 16, 2025
Genuine, verified customer reviews from the 7 Days profile on Angi. Names are shown exactly as Angi publishes them.
Nearby
We also work just over the Maynard line.
Same crew, same schedule, different housing stock. Each of these towns has its own page.
- Bathrooms in Waltham
Waltham, MA
Two-families, triple-deckers and 1920s colonials — where a bathroom sits over somebody's ceiling.
- Bathrooms in Newton
Newton, MA
Victorians, shingle-style and centre-entrance colonials, where the primary bath has to be carved out of what's there.
- Bathrooms in Watertown
Watertown, MA
Bungalows, two-families and 1950s ranches with original mud-set tile that has held on for seventy years.
Straight answers
Bathroom questions we get in Maynard.
How long does a bathroom remodel take?
A standard full bath runs about seven working days on site, plus the shower glass, which is templated after the tile is grouted and installed when the fabricator delivers. Layout changes, custom tile patterns and long-lead vanities push that out — and we put the real number in your written proposal instead of the optimistic one.
How long will I be without a kitchen?
For a straightforward kitchen with no layout change, plan on roughly three to five weeks on site, plus the countertop fabrication gap between template and install. We give you the real calendar in the written proposal.
Can we still use the room while you work?
Not the one we're building. If it's your only full bath or your only kitchen, tell us at the estimate — we sequence the toilet or a temporary setup back in as early as the work allows and we'll tell you honestly which days or nights you'll want a plan B.
Do you pull the permits?
Yes. Plumbing and electrical permits are pulled with your town's building department and we schedule the inspections. You don't chase paperwork.
What does a kitchen or bathroom remodel cost?
It depends on the size of the room, whether the layout moves, and what you pick for cabinets, countertops, tile, vanity and fixtures. We don't quote either room over the phone. The on-site estimate is free, takes about thirty minutes, and produces a written itemized price within 48 hours.
Can you convert a tub into a walk-in shower?
Yes, and it's one of the most common jobs we do in older Greater Boston homes. It usually means a new pan and drain location, a proper sloped mortar bed and membrane, and a decision about whether to keep a curb or go curbless — which depends on your joists. We look at that at the estimate.
Can you move the sink, or take out a wall in my kitchen?
Usually yes. Moving a sink means new drain and supply, and taking out a wall means checking whether it's carrying load and how the ceiling above is framed. We look at both at the estimate before anyone promises an open floor plan.
Do you supply the cabinets and countertops, or do I?
Either works. If we supply them, they're ordered on our timeline and we own the delivery date. If you supply them, we build the schedule around your delivery and we'll tell you what we need and when. Same goes for a bathroom vanity.
Do you do small bathrooms and powder rooms?
Yes. A 5×7 second-floor bath in a 1920s two-family is our bread and butter, and a powder room is a short job we're happy to schedule.
What about asbestos or lead paint?
We don't do asbestos abatement or de-leading — those need a licensed specialist and we'll refer you to one. If we find something behind the wall during demo, we stop, tell you, and don't disturb it.
Who is actually in my house?
Our own vetted, certified crew. Same faces from demo day to the final walk-through, and you have Alessandro's number the entire time.
Free on-site estimate
Book a free estimate in Maynard
Thirty minutes in your bathroom, Monday to Saturday between 3 and 5 PM. Written itemized proposal within 48 hours.
- Estimate window
- Mon–Sat · 3:00 PM – 5:00 PM
- On site
- About 30 minutes
- Written price
- Within 48 hours
